Committee of Adjustment - Tuesday, November 25, 2025, 5pm
- Accountability Team

- 2 hours ago
- 5 min read
ten statutory public meetings
Minutes: not yet available
Watch Online: must register first (see link below)
Agenda: https://barrie.legistar.com/View.ashx?M=A&ID=1352790&GUID=F91CACCA-DED4-4513-92B2-22AEE8AFB39F
City's Legistar: https://barrie.legistar.com/MeetingDetail.aspx?ID=1352790&GUID=F91CACCA-DED4-4513-92B2-22AEE8AFB39F&Options=info|&Search=
Meeting Location: Zoom only
Registration Link: https://barrie-ca.zoom.us/webinar/register/WN_9xevNyZSTaCcVGMreygLHA#/registration
All Committee of Adjustment meetings are open to the public and any interested party can appear before the Committee to express their views in support of, or opposition to, an application.
At the meetings, the committee will announce the application(s) to be heard and the applicant will provide a brief overview of the application to the committee and the public. The Secretary-Treasurer will provide a summary of staff and agency comments, after which the chair will open the floor to members of the public to provide comments on the application.
Members of the public may also submit written comments to the Secretary-Treasurer in advance of the meeting by:
emailing comments to CofA@barrie.ca
mailing comments to the City of Barrie Planning Department, P.O. Box 400, Barrie, ON, L4M 4T5
delivering via the drop boxes at City Hall, 70 Collier Street, Barrie
Once a decision has been made at the meeting, a notice of decision will be sent to all interested parties. The applicant, the Minister or a specified person or public body that has an interest in the matter may appeal the committee's decision within 20 days of the decision being made. If no appeal is received within the 20-day appeal period, the decision is final and binding.
Note: In accordance with Section 45(12) of the Planning Act third party appeals by persons or individuals are not permitted.
Committee of Adjustment meetings are being held in a virtual forum with electronic participation. Hearings take place via a Zoom conference call. Registered attendees will be provided with a Meeting ID and Participant number. Please refer to the Virtual Public Meeting Participant Guide.
📜✅ Adoption of the Minutes
Minutes from October 28: https://barrie.legistar.com/View.ashx?M=M&ID=1347025&GUID=8FEDEE5D-3F6D-47B0-98C6-1F3348177777
🗣️👥 Statutory Public Meetings
🏠🛠️ 26 Parkside Drive
A65-25 Notice: https://barrie.legistar.com/View.ashx?M=F&ID=14929656&GUID=BB43DCF2-EABB-4A51-9C90-29C759D56D0F
To permit a new three-storey building containing four stacked townhouses
Minor Variances sought:
reduce side yard setback from 3m to 1.8m on one side of the lot
🏡🗺️ 100 Patterson Road
B32-25, A67-25, A72-25 Notice: https://barrie.legistar.com/View.ashx?M=F&ID=14929657&GUID=44F38108-C3D1-41B9-8FDC-EDCD525771FF
To sever the lot into two (residential) properties
Minor Variance sought
To allow each of the two properties to have a lot frontage of 12.7m (zoning bylaw requires 15)
🚗🚙 122 King Street
A66-25 Notice: https://barrie.legistar.com/View.ashx?M=F&ID=14929665&GUID=1C8326C3-75FC-481E-91DC-19C6DC5C4817
To allow a stand-alone outdoor storage unit that is not in conjunction with a building on the (light industrial) property
Minor Variance sought:
Permit the outdoor storage of goods and materials (motorized vehicles) that is not in conjunction with a business located within a building on the same property
🏘️🗺️ 52 & 54 Donald Street
B33-25, B34-25, B35-25, B38-25 Notice: https://barrie.legistar.com/View.ashx?M=F&ID=14929658&GUID=A23E59AE-F97E-42FB-BDE0-53D90700D316
To consolidate the two lots, and then sever the consolidated lot into four separate lots, to allow the construction of four street townhouses, each with three additional dwelling units (total of 4 units per dwelling/lot)
🏢🏘️ 375 Livingstone Street West
A64-25 Notice: https://barrie.legistar.com/View.ashx?M=F&ID=14929659&GUID=D86DB0A8-8367-43DC-889E-A0B4B5A7B663
To allow the development of a four-storey mixed-use condominium building with ground floor commercial and 28 residential units
Minor Variances sought:
increase building height from 9m to 14m
decrease the minimum Gross Floor Area from 20% to 8%
allow an unconsolidated outdoor amenity area (bylaw requires consolidated)
decrease parking standard from 42 spaces (1.5 per residential unit) to 37 spaces (1.3 per residential unit)
decrease minimum drive aisle width from 6.4 to 6m
🏢🏘️ 129 Essa Road
A60-25 Notice: https://barrie.legistar.com/View.ashx?M=F&ID=14929660&GUID=F63B17CF-2A47-4212-B92D-B1730374FB87
To allow the development of a 5-storey, 20-unit walk-up apartment building
Minor Variances sought:
increase maximum density from 53 to 253 units per net hectare
allow an unconsolidated outdoor amenity area of 256 sq.m (bylaw requires consolidated area of minimum 240)
recognize an existing lot frontage of 20m (bylaw requires 21m)
reduce front yard setback from 7m to 3m
reduce side yard setback from 1.8m to 1.3m
reduce rear yard setback from 7m to 6.5m
reduce landscaped open space from 35% to 30% of lot area
increase maximum lot coverage from 35% to 55%
increase maximum Gross Floor Area from 60% to 228% of lot area
increase the number of storeys from four to five, but keep the maximum total height at 20m
decrease the landscape buffer width from 3m adjacent to a parking area and along the side and rear lot lines to 1.18 - 2.2m
🏢🏘️ 107 Essa Road
A61-25 Notice: https://barrie.legistar.com/View.ashx?M=F&ID=14929661&GUID=ECF6D544-8C91-44DA-ACEA-9A1CA17C1B85
To allow the development of a 5-storey, 20-unit walk-up apartment building
Minor Variances sought:
increase maximum density from 53 to 229 units per net hectare
allow an unconsolidated outdoor amenity area of 346 sq.m (bylaw requires consolidated area of minimum 240)
recognize an existing lot frontage of 20m (bylaw requires 21m)
reduce front yard setback from 7m to 3m
reduce side yard setback from 1.8m to 1.3m
increase maximum lot coverage from 35% to 50%
increase maximum Gross Floor Area from 60% to 206% of lot area
increase the number of storeys from four to five, but keep the maximum total height at 20m
decrease the landscape buffer width from 3m adjacent to a parking area and along the side and rear lot lines to 1.3 - 2.3m
🏢🏘️ 111 Essa Road
A62-25 Notice: https://barrie.legistar.com/View.ashx?M=F&ID=14929662&GUID=99C5A2EE-C3F2-4734-883A-1D6D0AE4D896
To allow the development of a 5-storey, 20-unit walk-up apartment building
Minor Variances sought:
increase maximum density from 53 to 229 units per net hectare
allow an unconsolidated outdoor amenity area of 347 sq.m (bylaw requires consolidated area of minimum 240)
recognize an existing lot frontage of 20m (bylaw requires 21m)
reduce front yard setback from 7m to 3m
reduce side yard setback from 1.8m to 1.3m
increase maximum lot coverage from 35% to 50%
increase maximum Gross Floor Area from 60% to 206% of lot area
increase the number of storeys from four to five, but keep the maximum total height at 20m
decrease the landscape buffer width from 3m adjacent to a parking area and along the side and rear lot lines to 1.3 - 2.2m
🏘️🚗 121 Peel Street
A63-25 Notice: https://barrie.legistar.com/View.ashx?M=F&ID=14929663&GUID=6DD54E4E-D1B0-4829-83CF-3F208D8F8101
To create an additional residential unit within a detached garage
Minor Variances sought:
decrease minimum side yard setback from 3m to 0.5m
increase building height for an additional residential unit within an accessory building from 4.5m to 7.15m
🏘️🗺️ 156 Owen Street
B36-25, B37-25, A69-25, 70-25 Notice: https://barrie.legistar.com/View.ashx?M=F&ID=14929664&GUID=51EFA990-22BC-4C81-9257-AB1B8ACBAB6E
Sever the property into three lots, to allow for the construction of three street townhouses, each with three additional dwelling units (total of 4 units per dwelling)
Minor Variances sought:
Lot 1 (end unit)
decrease side yard setback from 3m to 1.5m on one side of the lot
Lot 3 (end unit)
decrease side yard setback from 3m to 1.5m on one side of the lot






Comments