General Committee – Wednesday, September 10, 2025, 7pm
- Accountability Team
- Sep 6
- 6 min read
Updated: 5 days ago
moving forward with the Sea Cadets' new facility, zoning amendments for properties in Wards 2 and 8, pedestrian crossing improvements near W.C. Little Elementary School
Minutes: https://barrie.legistar.com/View.ashx?M=M&ID=1315826&GUID=0F3B179E-146E-48CF-BF05-F7C59A62148B
Watch Online: https://www.youtube.com/watch?v=-femcaCNu3Y
Agenda: https://barrie.legistar.com/View.ashx?M=A&ID=1315826&GUID=0F3B179E-146E-48CF-BF05-F7C59A62148B
City's Legistar: https://barrie.legistar.com/MeetingDetail.aspx?ID=1315826&GUID=0F3B179E-146E-48CF-BF05-F7C59A62148B&Options=info|&Search=
Meeting Location: Council Chambers or online
All members of Council present
📝📑 Reports of Reference, Advisory or Special Committees
🧑💼🕴 Executive Committee
Report from August 13: https://barrie.legistar.com/View.ashx?M=F&ID=14753552&GUID=E87D6B1C-2766-4876-A25D-8F015A980A49
RECEIVED (though no vote taken)
📑🗂 Staff Reports
⛵️🪖 Sea Cadets Parade Ground
Report: https://barrie.legistar.com/View.ashx?M=F&ID=14753550&GUID=FCAEF65E-1A02-43E6-910A-B3175AF6A71C
Recommending Concept 3 - Military Heritage Park Ceremonial Plaza as the preferred concept for the proposed Sea Cadets parade ground
this has been identified by staff as the one with minimal disturbance to existing conditions and uses, most cost-effective, and satisfies several preferences of the Sea Cadets
Add $777K to the 2025 Capital Plan, funded from the Reinvestment Reserve, for implementation of the preferred concept
HELD by Harris, for questions of staff only (no amendments)
CARRIED, unanimously
separate report requested by Morales (it already would be separated, since it was held and voted on, though)
🏘️🏢 Zoning Bylaw Amendment - 375, 389-393 Yonge Street (Ward 8)
Report: https://barrie.legistar.com/View.ashx?M=F&ID=14753544&GUID=CDB11AA1-6EB3-48E7-B217-D04DA762DF86
Rezone FROM General Commercial (C4) and General Commercial with Special Provisions (C4)(CP-264) TO Mixed Use Node with Special Provisions, Hold (MU1)(SP-XXX)(H-YYY)
To facilitate the development of a 6 storey, residential rental apartment building with a total of 114 residential units
Special Provisions:
reduce minimum parking ratio from 1 to 0.85 parking spaces per dwelling unit
decrease minimum drive aisle width from 6.4 to 6m
permit minimum front yard setback of 1m for 70% of the frontage, instead of 75%
eliminate the requirement for minimum coverage for commercial uses of 50% of first storey gross floor area
eliminate the requirement for fully paved and seamless front yard connections to the abutting sidewalks
reduce the minimum front yard setback from 3m to 2m for an indoor amenity area, and permit the building to encroach into the front yard a maximum of 1.5m above the ground floor residential uses
permit an encroachment of 1.5m into the front yard for a porch
increase maximum parking lot area coverage from 35% to 41% for an apartment dwelling
lands to be developed in accordance with the Conceptual Site Plan provided, as it relates to building height, placement and setbacks, as well as the location and configuration of landscape areas, amenity spaces and parking areas
Holding Provision:
may be removed once the owner/applicant satisfies the requirements of a Certificate of Property Use and/or Record of Site Condition accepted by the Ministry of Environment, Conservation and Parks under the Environmental Protection Act prior to any site works or issuance of a Building Permit
APPROVED on Consent
🧑⚕️🏢 Zoning Bylaw Amendment - 89 Big Bay Point Road (Ward 8)
This item has been moved to a future General Committee meeting
Report: https://barrie.legistar.com/View.ashx?M=F&ID=14753545&GUID=0E5D7DA0-939F-46AC-A559-A2CB917324EA
Rezone FROM General Industrial (GI) TO General Industrial with Special Provisions (GI)(SP-XXX)
To facilitate the development of a medical office within an existing building
Special Provisions:
permit a medical office
reduce minimum drive aisle width from 6.4 to 4m
reduce minimum side yard setback adjoining a street from 7m to 6.3m
reduce the minimum front yard setback to a daylighting triangle from 7m to 6m
any new development or redevelopment of the site will be required to comply with all applicable zoning standards in effect at the time of such redevelopment
🏬🏢 Zoning Bylaw Amendment - 149, 151 and 153 Dunlop Street East and 5 Mulcaster Street (Ward 2)
Report: https://barrie.legistar.com/View.ashx?M=F&ID=14753546&GUID=450DE9BB-FBCD-422A-A632-55472CB92E73
Rezone FROM Central Area Commercial-1 (C1-1) TO Central Area Commercial-1 with Special Provisions, Hold (C1-1)(SP-XXX)(H-YYY)
To facilitate the development of a 25 storey, mixed-use building with a total of 160 residential units and 822.22 sq.m of commercial space
Special Provisions:
reduce minimum parking ratio from 1.5 to 0.85 spaces per dwelling unit
increase maximum gross floor area from 600% to 1000% of lot area
increase maximum building height from 10m within 5m of the front lot line & lot flankage and 30m beyond 5m of the front lot line and lot flankage to 80m overall (yes, 8x what's allowed within 5m of the front, and almost 3x what's allowed overall)
eliminate the requirement for a 3m continuous landscaped buffer area along the side and rear lot lines
lands to be developed in accordance with the Conceptual Site Plan provided, as it relates to building height, placement and setbacks, as well as the location and configuration of landscape areas, amenity spaces and parking areas
Holding Provision may be removed once the following is complete:
owner/applicant satisfies the requirements of a Certificate of Property Use and/or Record of Site Condition accepted by the Ministry of Environment, Conservation and Parks under the Environmental Protection Act prior to any site works or issuance of a Building Permit
owner/applicant demonstrates that no interference and no adverse impacts on the municipal production wells due to known shallow and deep aquifer connections and the presence of known VOCs to the satisfaction of the Waste Management and Environmental Sustainability Department (Environmental Risk Management and Compliance Branch)
execution of a Site Plan Agreement which includes (but is not limited to):
replacement of 8 municipal parking spaces to the satisfaction of the Transit and Parking Department
confirmation of an easement over the City of Barrie lands to maintain access to Mulcaster Street
demonstration of conformity to the affordable housing policies of the Official Plan
demonstration that the overall design will not exceed 205 masl (Metres above sea level) to the satisfaction of the Waste Management and Environmental Sustainability Department (Environmental Risk Management and Compliance Branch)
HELD by Nixon
AMENDMENT by Nixon:
Change the parking ratio to 1.2 parking spaces per dwelling unit (1.5 are currently required, application was asking for 0.85)
Delete requested permission for maximum building height of 80m (keep at maximum of 10m within 5m of the front lot line & lot flankage, and 30m beyond that 5m)
Delete clause specifying that lands to be developed in accordance with the Conceptual Site Plan provided, as it relates to building height, placement and setbacks, as well as the location and configuration of landscape areas, amenity spaces and parking areas
CARRIED, unanimously
MOTION, as amended, CARRIED unanimously
🛑🚸 W.C. Little Pedestrian Crossing Improvements (Ward 7)
Report: https://barrie.legistar.com/View.ashx?M=F&ID=14753548&GUID=9A1AD4CC-DE7B-4ACD-BAFC-8427675D8F91
Recommending a Pedestrian Crossover be installed on the east leg of Sundew Drive & Violet Street, the west leg of Sundew Drive and Holly Meadow Road / Lee Crescent, and the south leg of Holly Meadow Road and Timothy Lane
Add an all-way stop at Timothy Lane & Butternut Drive (Northbound and Southbound on Butternut Drive and Westbound on Timothy Lane)
APPROVED on Consent
⛵️🪖 General John Hayter Southshore Community Centre Expansion - Phase 2
Report: https://barrie.legistar.com/View.ashx?M=F&ID=14753551&GUID=8F6EECA6-8EDE-4757-BC3A-98E7E4F11394
Option A - Standalone Sea Cadets Facility Design Report: https://barrie.legistar.com/View.ashx?M=F&ID=14753522&GUID=9A2938AA-B873-443D-820E-FFEA7286797F
Option B - Addition to the Southshore Centre Design Report: https://barrie.legistar.com/View.ashx?M=F&ID=14753521&GUID=00876B6A-9AB4-402B-8310-67CE509885D0
Recommending Option A - a 600 sq.m standalone Sea Cadets building
identified by staff as the most feasible and cost-effective solution
Add $728,145 to the 2026 budget request for FC1318 - Sea Cadets Relocation Project, allocated from the Tax Capital Reserve, for a total project funding of $6,728,145 to advance the Sea Cadets Relocation Project to Phase 2
APPROVED on Consent
🛣️🤝 2025 Pavement Management Program - Contract Changes
Report: https://barrie.legistar.com/View.ashx?M=F&ID=14758615&GUID=ED7A0839-D1F3-452A-9F14-6CD8D788D31E
Receive the update for information purposes
Contractor has not met agreement satisfactorily, and contract has been terminated - propose letting them complete what they started, and postponing the incomplete projects to a future date.
HELD by Thomson
AMENDMENT by Thomson:
Notwithstanding the Procurement Bylaw, to give the remainder of the contract (40%) to the second-lowest bidder, and complete all projects as scheduled.
CARRIED, unanimously
MOTION, as amended, CARRIED unanimously
🤐🏷️ Confidential Potential Sale of Property - Status Update City-Owned Property
HELD by Kungl
AMENDMENT by Kungl:
Authorize the Mayor and Clerk to execute the offer for purchase and sale (circulated confidentially), on terms & conditions satisfactory to the Director of Legal Services and approved by the Chief Administrative Officer
CARRIED, unanimously
No vote was taken on the motion as amended
⛽️🔌 Dedicated Locator Agreements
Report: https://barrie.legistar.com/View.ashx?M=F&ID=14753554&GUID=51C1E73B-3C51-413C-86A7-A30DE3EF21CD
Authorize the Director of Infrastructure to complete and/or approve Dedicated Locator Agreements with various contractors and utility providers
Authorize the Mayor and City Clerk to execute the agreements on behalf of the City
APPROVED on Consent
📥🔄 Circulation List Referrals
🌳🛝 Sam Cancilla Revitalization Concept Plan
Letter of Support from BIA: https://barrie.legistar.com/View.ashx?M=F&ID=14756645&GUID=2A3257D1-05BB-4C2E-B5C3-F81ACDA27D24
Concept Master Plan: https://barrie.legistar.com/View.ashx?M=F&ID=14756639&GUID=A2C5A92C-B84B-4814-A688-D1C8E7CC83C2
Park Layout: https://barrie.legistar.com/View.ashx?M=F&ID=14756646&GUID=DC71C5E7-2584-4F47-90D2-8F867F4E2A04
Petition Card: https://barrie.legistar.com/View.ashx?M=F&ID=14756672&GUID=F42E8952-6538-49E0-9BC4-B6275F9E6866
Drawings of the proposed design, and support of the design concept from neighbours and the BIA
REFERRAL by Thomson to the Infrastructure & Community Investment Committee
CARRIED, unanimously

Comments